A rack is rated for 600 kW, a drive for five years, an interconnection queue in gigawatts. None of it survives contact with a real site. Infrabench is a set of free tools that correct those numbers against public data, with every constant on the page.
177racks on paper, 30 MW at 120 kWracks after PUE 1.2racks fit, of 250 on paper
Fits
42 lost to overhead at PUE 1.2
31 held back by a 15% margin
Rack Budget
You have the megawatts. What actually fits?
Power, cooling and floor area for an AI hall. Start from a megawatt budget or from a fleet size and get the other side, plus the heat you have to reject.
Data: NVIDIA platform disclosures, Uptime Institute PUE survey
Siting under a power constraint. Ten US grid regions ranked by the earliest realistic date a utility can energize your load, drawn against your deadline.